CNG compression | 150 to 600 psig suction

One package. 150 to 600 psig in. CNG fill pressure out.

The 3-stage NuPresto 400 covers the full 150 to 600 psig suction window in a single configuration. Same Fornovo DA300 frame and controls philosophy as the 2-stage, with the staging and cooling needed to handle low and mid-range pipeline and RNG inlet pressures.

Overview

The 3-stage NuPresto 400 is built for jobs where pipeline or RNG inlet pressure sits anywhere from 150 to 600 psig and CNG discharge still has to land at 4,200 psig. Three compression stages, three intercooler sections and a final aftercooler keep stage temperatures and ratios inside the design envelope across the entire suction range, without forcing you to specify a separate booster or pick between sub-configurations.

Mechanically it is the same NuPresto 400 platform: Fornovo Gas DA300 frame, non-lubricated water-cooled cylinders, PLC controls and full FAT in shop.

NuPresto 400 3-stage compressor package

Key specifications

Compression stages3-stage
Compressor frameFornovo Gas DA300 heavy-duty reciprocating
CylindersNon-lubricated, water-cooled, with HP valves
Suction pressure150 to 600 psig
Discharge pressureUp to 4,200 psig
Flow rateUp to 2.6 MMSCFD
Driver300 to 400 HP electric motor (depends on suction pressure), 1,200 rpm
Interstage cooling3-section air cooler plus jacket water circuit
Discharge treatmentInterstage scrubbers and final discharge coalescer
Cooling packageClosed-loop glycol with multi-fan air cooler
Control systemPLC-based with HMI, remote monitoring via Ewon
Lube oilChevron Cetus PAO 68 or approved equivalent, shaft-driven lube oil pump
Design standardsASME Section VIII Div. 1, B31.3, NEC, NFPA, API and ISO
SkidSingle skid, fully assembled and FAT-tested in shop

Overlap at 550 to 600 psig suction: engineering will recommend the better fit based on inlet stability and target flow. Detailed performance curves are not published; contact engineering for sized performance.

2-stage vs 3-stage at a glance

VariantSuctionFlowBest fit
2-Stage550 to 900 psigUp to 3.64 MMSCFDHigh-pressure pipeline mother stations
3-Stage150 to 600 psigUp to 2.6 MMSCFDRNG and low to mid-pressure pipeline service
4-Stage40 to 100 psigUp to 1.1 MMSCFDDeclining wells, low-pressure RNG, stranded gas

Why NuPresto 400 3-Stage

One configuration, wide operating window

From RNG dryer outlets at 150 psig up to mid-pressure pipeline taps at 600 psig, the 3-stage covers it. No need to specify a sub-variant or commit to a narrow operating band on day one.

Three-section air cooler

Engineered air cooler with separate sections for each stage discharge plus jacket water. Stage temperatures stay inside the design window even at 100 °F ambient and 3,000 ft elevation.

Same frame, same controls, same service plan

Identical Fornovo DA300 bottom end, control philosophy, HMI and remote monitoring as the 2-stage. Same maintenance intervals, same spares stocked at our shop. Operators trained on one variant are trained on both.

Non-lubricated cylinders

No oil carryover into the gas stream. Cleaner downstream equipment, less environmental risk, simpler permitting.

Engineered for continuous service

Interstage scrubbers, pulsation control and ASME-stamped vessels and coolers sized for 24/7 RNG and CNG mother station duty.

Built and tested in shop

Final assembly, FAT, loop checks and HMI commissioning happen in our shop. Issues get caught in the shop, not on your site.

Typical applications

  • RNG-to-CNG mother stations off RNG dryer outlets
  • Low and mid-pressure pipeline taps and lateral compression
  • CNG fueling sites where inlet pressure is unstable or seasonally variable
  • Virtual pipeline trailer filling (pairs with NuBlu VPT-64 and VPT-128)
  • Wellhead and field gas compression with CNG offtake
  • Replacement of aging multi-stage CNG packages on existing pads

What's included

  • Single skid with 3-stage compressor, motor, multi-section air cooler and process piping
  • Inlet filter, three interstage scrubbers and final discharge coalescer
  • Closed-loop glycol cooling system with jacket water circuit
  • PLC, HMI and field instrumentation, wired and tested
  • Cause-and-effect diagram, control narrative and FAT package
  • ASME-stamped pressure vessels and coolers, B31.3 piping
  • Installation, commissioning and start-up procedure
  • Recommended spare parts list and pricing

Engineering and aftermarket support

Every 3-stage NuPresto 400 ships with a complete engineering package: P&IDs, GA drawings, electrical load lists, lifting and torsional analyses and a full O&M manual. Critical spares, including complete cylinders, are stocked at our shop for fast response.

Field service, troubleshooting and remote diagnostics are handled by the same team that designed and built the unit.

Ready to size it?

Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.