CNG delivery | VPT-64 and VPT-128

CNG storage and pressure reduction. One trailer. Two sizes.

NuBlu Energy's Virtual Pipeline Trailers carry CNG to sites where pipeline gas is not available. The bumper-pull VPT-64 for light-duty and remote sites, the tractor-pulled VPT-128 for higher-volume continuous delivery. Both ship with integrated 2-stage pressure reduction and a catalytic heater.

Overview

The VPT family delivers CNG to sites where running pipeline is not available or not economical. Type IV composite cylinders hold gas at 4,000 psig. An integrated 2-stage onboard pressure reduction system, fed through a thermostatically controlled catalytic heater, drops trailer pressure to a user-set outlet between 5 and 50 psig, ready to feed the customer's downstream system.

The VPT-64 is bumper-pullable behind a standard pickup. The VPT-128 doubles the storage on a DOT highway-rated trailer for routes where the smaller unit would mean too many trips. Optional solar and battery power, Allen-Bradley controls with Ewon telemetry, and remote monitoring of pressure, temperature, flow and GPS location are available for off-grid operation.

VPT-64 virtual pipeline trailer on its lowboy
VPT-64 fleet at the NuBlu yard in Center, Texas, ahead of delivery to a gas utility.

Key specifications

Storage capacityVPT-64: 64,000 SCF at 4,000 psig. VPT-128: 128,000 SCF at 4,000 psig
Cylinder typeType IV lightweight composite
Operating pressure200 to 4,000 psig
Process temperature-40 °F to 160 °F
Fill ports1 in. CNG quick-connect or NGV1
Onboard PRS2-stage pressure regulation, 200 to 3,600 psig inlet
PRS outlet pressure5 to 50 psig, user set
Design flow rate1 to 15 MSCF/hr (24 to 360 MSCF/d)
Process heaterCatalytic, thermostatically controlled, discharge held above 35 °F
Discharge connection3 in. 150# flanged
Trailer typeVPT-64: bumper-pull deck-over, pintle hitch, 16,000 lb GVWR, 20 ft x 8 ft deck. VPT-128: tractor-pulled, DOT highway rated
SafetyOnboard thermal reliefs and PSVs, full ESD and shutdown system
Power and controls (optional)Solar and battery for off-grid operation, Allen-Bradley controls with Ewon telemetry, remote monitoring with GPS
Design standardsASME Section VIII Div. 1, B31.3, NEC, NFPA

Final flow, pressure and power are tuned to your gas analysis, suction conditions and site requirements. Contact engineering for a sized proposal.

Why VPT-64 / VPT-128

Storage and PRS in one trailer

No separate pressure reduction skid to specify, permit or move between sites. Storage and regulation are integrated and FAT-tested as one unit.

Type IV composite cylinders

Lighter than steel, 4,000 psig rated, with built-in thermal reliefs. Lower trailer tare weight means more gas, less wasted GVWR.

Catalytic process heater

Flame-free heating handles the temperature drop from CNG decompression and keeps outlet gas above 35 °F across the operating window. No open flame, no separate fuel hookup, no permitting headache.

2-stage pressure regulation

A primary regulator drops trailer pressure to an intermediate level into a process accumulator that dampens swings. A final-stage regulator delivers outlet pressure within plus or minus 10% of setpoint.

Built and tested in shop

Final assembly, FAT, valve and PSV verification and PRS commissioning happen in our shop.

Pairs with the PRS-G and PRS-C series

For higher-flow sites where the trailer's onboard PRS is not sized to deliver, the VPT family pairs with NuBlu's standalone PRS packages.

Which one fits your site

Choose the VPT-64 if

  • Site demand is intermittent or seasonal
  • You want to move trailers behind a standard pickup
  • Permitting and parking footprint need to stay small
  • Trailer-swap frequency is not a major cost driver

Choose the VPT-128 if

  • Site demand is continuous or high volume
  • You want to cut delivery trips per week
  • DOT highway operation behind a Class 8 tractor is in scope
  • Lower delivery cost per MCF matters more than mobility

Typical applications

  • Remote site fuel gas supply where pipeline access is limited
  • Supplemental supply and peak shaving for gas utilities
  • Mobile and temporary power generation
  • Drilling and completions support
  • Pipeline integrity work and pipeline pack-up
  • Construction site fuel gas
  • Stranded gas monetization and remote industrial loads

What's included

  • Trailer with Type IV composite CNG cylinders
  • CNG quick-connect fill ports (NGV1)
  • Integrated 2-stage pressure reduction system
  • Thermostatically controlled catalytic process heater
  • PSVs and onboard cylinder thermal reliefs
  • Flanged discharge connection
  • Operating manual, FAT package and recommended spare parts list

Engineering and aftermarket support

Every VPT ships with a complete operating manual, FAT documentation and recommended spares list. Critical wear items, including regulator trims, PSV cartridges and instrumentation, are stocked at our shop for fast response.

Field service, troubleshooting and remote support are handled by the same team that designed and built the trailer.

Ready to size it?

Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.