Compressor enclosures at the Meritum Energy CNG mother station
Case study | CNG compression and EPC

A 5.5 MMSCFD mother station, pipeline to power, one contract.

Greenfield EPC for a CNG retail operator in Texas: interconnect, compression, power upgrade and the regulatory work to put it on line.

ClientMeritum Energy
LocationTexas
Delivered2023
Value$2MM, greenfield EPC

The challenge

Meritum Energy needed a new CNG mother station capable of 5.5 MMSCFD to supply its trailer fleet, and needed it delivered as one accountable scope: the pipeline tap and interconnect, the compression facility, a primary power upgrade to carry the new load, and guidance through the regulatory process for the pipeline connection.

What we delivered

  • Pipeline interconnect and facility piping
  • Compression facility engineered, procured and constructed by NuBlu
  • Power system upgrade for the new station load
  • Regulatory guidance and submittals for the pipeline interconnect
  • Commissioning and start-up

The numbers

5.5MMSCFD
EPCsingle contract
2023delivered

On site

What this means for you

A mother station is more than a compressor. The interconnect, the metering, the power and the paperwork decide the schedule. NuBlu packages the compression and delivers the facility around it with the same crew, which is why Meritum has since taken multiple NuPresto compressor packages from NuBlu.